PDS

Prefabricated Design Systems

Land. Lock.
Rise.

Patented modular connections for volumetric buildings that lock from the outside.

01 — The problem

Modular still gets joined the old way: bolted from inside, or welded on site.

Bolted

From inside the unit.

Trades enter finished rooms and work corners they can barely reach. The module was complete until someone had to crawl back in to join it.

Welded

Cost back on the site.

Field welding is slow, skilled, and expensive. It puts the cost of development back where prefabrication was meant to take it out.

We lock from the outside. The room stays closed.

02 — The system

A connection made for quick deployment.

Not interior bolts. Not field welds. Modules land complete, lock from the exterior, and keep rising.

01

External lock

Every joint is reached from outside the unit. Interiors stay closed, finished, and protected.

02

Continuous stack

Load travels from foundation to roof, floor after floor. The building rises as a single system.

03

Factory-born

The connection is designed into the module. The site only has to lock it.

03 — Deployment

Four moves. Then occupancy.

  1. Factory floor producing steel volumetric building modules
    01

    Fabricate

    Volumetric modules leave the plant complete—structure, envelope, interiors.

  2. A volumetric module traveling by truck toward a city
    02

    Mobilize

    Single-truck loads. Site work runs in parallel with the factory.

  3. A module landing onto the stack below
    03

    Land

    Crane-lowered onto the stack. Indexed. Aligned.

  4. Completed modular apartment building at dusk
    04

    Lock

    Exterior fasteners close the joint. The next module can land.

04 — Methodology

Prefabrication, practiced as a system.

Volumetric modular

Rooms as structural units—apartments, stairs, shafts, corridors—built complete and stacked.

Industrialized production

Repeatable assembly-line fabrication. Tighter tolerances than the weather will ever allow.

Parallel critical path

Factory and foundation move at the same time. The crane is the last mile, not the whole job.

Design for assembly

Lock from the outside. No trades back inside finished rooms. No field welds to inflate the job.

05 — Intellectual property

Modular Construction Connection Mechanism

Held and licensed by Prefabricated Design Systems. A family of granted U.S. patents covering the system that secures volumetric modules from an external position.

06 — Inquire

License the lock.

For developers, manufacturers, and partners building with volumetric modules.

We reply to licensing and partnership inquiries.